Our Client entrusted and engaged Exclusive Residence to undertake this expansive and very complex knock down / rebuild and part renovation of his tired Riverside property in Claremont, because he trusted we would deliver, and we are on target to exceed all expectations.

Throughout the 18 month design phase, we worked hand in hand with a handpicked design team consisting of a skilled designer , structural and mechanical engineers, geotechnical consultants, ,specialist shoring & piling contractors and an experienced interior designer all sharing our expertise and knowledge together to create and deliver the blueprints for this 1500sqm 4 level home luxury custom home .

This Exclusive Residence has been built over multiple levels two of which are below ground, this involved a massive earth cut excavation and specialised piled retaining on all boundaries to support the large under croft, courtyard, studio and gallery which adjoin the main home. Masterfully designed the home features six large bedroom with practical storage solutions and clever bathroom layouts that are both functional and luxurious.  A large gym, home theatre with coffered ceilings and state of the art automation and make family entertaining a pleasure.

The living quarters comprise of six oversized bedrooms all with private bathrooms, a large office offers the option of working from home if required. A magnificently appointed Kitchen with Miele appliances, exquisite cabinetry on which are laid  hand selected slabs of Italian stone for the benchtops would be the envy of any MasterChef .The custom built cool room and cellar from the kitchen open up to the living and dining room which expand over the whole Ground level, all take in the magnificent direct river views.

This home is simply breathtaking and showcases the meticulous planning involved in building a home of this complexity in a short timeframe displaying the fine attention to detail and Luxury that Exclusive Residence is renowned for.

City Beach

February Update

  • First Floor Slab is loaded with bricks and structural steel has been installed
  • First Floor scaffold has been lifted, TBars have been installed & brickwork is now 95% complete

Banool Crescent City Beach

February Update

  • Front Elevation is looking great now the scaffold has been removed
  • The office & ensuite cabinets & stone has been installed
  • The Basketball Court concrete floor has now been poured